Cost to mine · reading 2 Oct 2026

The halving is a height, not a date

The next Bitcoin halving fires at block 1,050,000. At the 2 October 2026 reading, height 969,538, 80,462 blocks remain, which is 559 days at a ten-minute block and projects to 12 April 2028. The block subsidy falls from 3.125 to 1.5625 BTC, so the shutdown price of the default fleet on this site doubles from $41,949 to $83,898. That date sits inside the depreciation life of every machine sold today, and ignoring it overstates four-year mining revenue by 38.6%.

Held constant across this page Height now 969,538 Halving height 1,050,000 Blocks remaining 80,462 Days at 10 min 558.8 Spot $85,941 Power $0.05 per kWh PUE 1.10 Uptime 96% Fleet 50 Antminer S21 Pro Wall draw 193.1 kW
01

Nothing in the protocol knows what day it is

The subsidy schedule is written in blocks. A calendar date for the halving is a forecast about how fast blocks arrive, and forecasts about block arrival have been wrong in both directions for seventeen years.

The Bitcoin halving is triggered by block height 1,050,000 and by nothing else. At the 2 October 2026 reading the chain stood at height 969,538, so 80,462 blocks remain to be found. Divide by the 144 blocks a day the protocol targets and the answer is 558.76 days, which is where the figure of 559 days used everywhere on this page comes from.

The projected calendar date, 12 April 2028, is the least reliable number on this page and it is printed here only because readers ask for it. Difficulty retargets every 2,016 blocks to pull the average interval back towards ten minutes, but it retargets after the fact, so a network that is gaining hashrate runs a persistently short block and arrives early. The table below is the whole of the uncertainty: it takes 80,462 blocks as given and varies only the average interval.

A ten-second difference in the average block interval moves the halving by roughly 10 days. That is the correct order of magnitude for the error bar on any halving countdown, including this one. What does not move is the height, which is why every projection on this site steps the subsidy at a block count rather than at a date.

Average block intervalDays from reading Projected halvingShift against ten minutes
9.4 minutes 525.2 10 March 2028 −34 days
9.6 minutes 536.4 21 March 2028 −22 days
9.8 minutes 547.6 1 April 2028 −11 days
10.0 minutesthe protocol target 558.8 12 April 2028 reference
10.2 minutes 569.9 23 April 2028 +11 days
10.4 minutes 581.1 5 May 2028 +22 days

Height and difficulty: mempool.space · read 2026-08-15 · Interval scenarios are arithmetic on 80,462 blocks, not a forecast

02

What halves, and by exactly how much

The block subsidy falls from 3.125 BTC to 1.5625 BTC in a single block. On this model the fee term halves with it, so the reward per block halves exactly and coins per day halve exactly.

At block 1,050,000 the subsidy drops from 3.125 BTC to 1.5625 BTC. Every projection on this site runs that step through subsidyAt(t), which walks the schedule forward in 1458-day intervals rather than holding a constant, so a four-year model contains one halving and a ten-year model contains two.

The second half of the reward is transaction fees, carried here as 0.71% of the subsidy, derived from the 0.0223 BTC 30-day average fee per block. Expressing fees as a share of subsidy means the fee term halves alongside the subsidy, which is a modelling choice worth naming rather than burying. The choice is defensible in 2026 for one reason: fees are negligible. Cointelegraph, on-chain data reported on 12 August 2026 that fees had fallen to 0.69% of miner revenue, a ten-year low. Whether that fraction of a percent halves or holds is not a decision a fleet turns on.

Because the reward halves exactly, the arithmetic downstream is unusually clean. Coins per day for a given hashrate share halve. Revenue at a fixed bitcoin price halves. The electricity bill does not move by a single cent, because a machine draws the same watts whether the subsidy is 3.125 BTC or 1.5625. So the price at which revenue meets the power bill doubles, and it doubles for every machine on the network at the same instant.

EpochStarts at heightDay from reading SubsidyReward incl. feesNetwork BTC a day
Currentreading 2 Oct 2026 840,000 0 3.125 BTC 3.14719 BTC 453.2
Halving 1projected 12 April 2028 1,050,000 559 1.5625 BTC 1.57359 BTC 226.6
Halving 2projected 10 April 2032 1,260,000 2,065 0.78125 BTC 0.78680 BTC 113.3
Halving 3projected 8 April 2036 1,470,000 3,523 0.390625 BTC 0.39340 BTC 56.6

Heights are exact. Days and dates are projections at a ten-minute block and inherit the error bar in section 01. Network coins a day assumes 144 blocks and the current fee share held constant, which is an assumption about fees and not a protocol rule.

03

The shutdown price, before and after

The shutdown price is the bitcoin price at which a fleet's revenue exactly equals its electricity bill. For the default fleet on this site it doubles at the halving, from $41,949 to $83,898.

The shutdown price of the default fleet, fifty Antminer S21 Pro units drawing 193.1 kW at the wall at $0.05 per kWh, is $41,949 on 2 October 2026 and $83,898 after the halving. The ratio is 2.000, and it is that clean because the same subsidy term appears in the numerator of revenue and nowhere in the cost. Spot is $85,941, so today the fleet clears its power bill with 33% of gross to spare, and after the halving it would need bitcoin 33.1% above today's price simply to break even on electricity.

The shutdown price is the only hard floor in mining. Purchase price, financing and depreciation are already spent and cannot be recovered by continuing to run, so the question a fleet faces every morning is narrower than profitability: does today's revenue exceed today's power bill. Below the shutdown price the answer is no and the correct action is to switch off, which is why hashrate falls in a drawdown rather than grinding on at a loss.

Difficulty makes the picture worse rather than better. Holding difficulty at today's level is generous to the post-halving case, because the network has to lose hashrate for difficulty to fall and that only happens after miners have already been losing money. At this model's default drift of 0.2% per retarget, difficulty on day 559 is 1.090 times today's, and the fleet's shutdown price is $91,487 rather than $83,898.

Default fleet, per dayToday After the halving, difficulty heldAfter the halving, difficulty drifted
Bitcoin mined 0.005522 0.002761 0.002532
Gross revenue at $85,941 $351.70 $175.85 $161.27
Pool fee at 1% $3.52 $1.76 $1.61
Electricity $231.66 $231.66 $231.66
Net $116.53 −$57.57 −$72.01
Shutdown price $41,949 $83,898 $91,487

Electricity is the full reserved draw, which is how a hosting contract bills, while revenue is earned only during the 96% of the day the machines are hashing. Both columns after the halving hold the bitcoin price at $85,941 so that the halving is the only thing that has changed.

04

Every machine in the catalogue, before and after

17 of the 27 machines catalogued here cover their own electricity at $85,941 and $0.05 per kWh. After the halving, 3 do.

How many of the 27 catalogued machines clear their own power bill

Counted at $0.05 per kWh, PUE 1.10, uptime 96%, difficulty held at today's. The post-halving curve is the same curve moved right by a factor of exactly two, because halving the reward halves the coins and leaves the power bill untouched.

14 machines lost at spot
091827 $0$50k$100k$150k$200k$250k$300k spot $85,941 17 today 3 after the halving machines

Of the 27 machines in this catalogue, 17 clear their own power bill at the 15 August 2026 spot price of $85,941, at $0.05 per kWh with PUE 1.10 and 96% uptime. After the halving, with the price and the difficulty both held still so that the halving is the only change, 3 do. 14 machines that are cash positive today are cash negative the day after block 1,050,000.

The 3 survivors are Antminer S23 Hyd, SealMiner A4 Pro Air, Antminer S23, all of them 2026 hardware at 9.5 to 11.0 J/TH. Every 2024 and 2025 machine in the catalogue falls below its power cost, including the Antminer S21 Pro that this site uses as its default fleet and that vendors are still selling new at $1,938 a unit. A machine bought today at $8.28 per terahash therefore has 559 days of positive cash flow ahead of it at this power price and this bitcoin price, and then needs one of three things to change: a higher bitcoin price, a lower power price, or enough of the network switching off to bring difficulty down.

MachineJ/THHashrate Shutdown price todayAfter the halving Net per day todayAfter
Antminer S23 HydBitmain, 2026 9.50 580 TH $26,568 $53,136 $9.99 $1.36
SealMiner A4 Pro AirBitdeer, 2026 10.90 336 TH $30,480 $60,960 $5.17 $0.17
Antminer S23Bitmain, 2026 11.00 318 TH $30,763 $61,526 $4.85 $0.11
Below this line: survives today, does not survive the halving. 14 machines.
Whatsminer M70S+MicroBT, 2025 12.87 244 TH $35,989 $71,978 $3.12 −$0.51
Antminer S21e XP Hyd 3UBitmain, 2024 13.00 860 TH $36,356 $72,712 $10.84 −$1.96
Whatsminer M79SMicroBT, 2025 13.50 930 TH $37,754 $75,509 $11.10 −$2.73
Antminer S21 XPBitmain, 2024 13.50 270 TH $37,754 $75,509 $3.22 −$0.79
Teraflux AH3880Auradine, 2025 14.50 600 TH $40,551 $81,102 $6.37 −$2.56
Antminer S21 ProBitmain, 2024 15.00 234 TH $41,949 $83,898 $2.33 −$1.15
Antminer S21 HydBitmain, 2023 16.00 335 TH $44,746 $89,492 $2.89 −$2.09
Antminer S21+Bitmain, 2025 16.50 216 TH $46,144 $92,288 $1.72 −$1.49
Avalon A1566HA 2UCanaan, 2025 16.80 480 TH $46,983 $93,966 $3.64 −$3.50
Antminer S21Bitmain, 2023 17.50 200 TH $48,941 $97,881 $1.33 −$1.64
Avalon A1566Canaan, 2024 18.49 185 TH $51,700 $103,399 $0.99 −$1.76
Whatsminer M63SMicroBT, 2023 18.50 390 TH $51,737 $103,475 $2.08 −$3.72
Whatsminer M66SMicroBT, 2023 18.50 298 TH $51,737 $103,475 $1.59 −$2.84
Antminer S19 XPBitmain, 2022 21.35 141 TH $59,701 $119,402 $0.22 −$1.88
Below this line: already below its own power cost at $85,941 and five cents, before the halving.
Antminer S19k ProBitmain, 2023 23.00 120 TH $64,322 $128,644 −$0.07 −$1.86
Whatsminer M50SMicroBT, 2022 26.00 126 TH $72,712 $145,424 −$0.57 −$2.45
Antminer S19j ProBitmain, 2021 29.50 104 TH $82,500 $165,000 −$0.95 −$2.50
Antminer S19 ProBitmain, 2020 29.55 110 TH $82,627 $165,254 −$1.02 −$2.65
Whatsminer M30S++MicroBT, 2020 31.00 112 TH $86,695 $173,390 −$1.25 −$2.92
Antminer S19Bitmain, 2020 34.21 95 TH $95,674 $191,347 −$1.46 −$2.88
Whatsminer M30SMicroBT, 2020 38.00 86 TH $106,271 $212,543 −$1.75 −$3.03
Antminer S17 ProBitmain, 2019 39.51 53 TH $110,493 $220,985 −$1.19 −$1.98
Whatsminer M20SMicroBT, 2019 49.41 68 TH $138,186 $276,371 −$2.41 −$3.42
Antminer S9 (13.5T)Bitmain, 2017 98.00 14 TH $274,068 $548,136 −$1.34 −$1.55

Ranked by shutdown price today, which for a fixed power price is a ranking by J/TH. Shaded rows still cover their electricity after the halving. Net per day is one unit, after the 1% pool fee and the full reserved power draw, at $85,941 and today's difficulty. The two machines priced at zero in the catalogue have no bid, so their capital cost is not the question; their power cost still is.

05

Four years, run twice

Freezing the block reward for four years overstates the bitcoin this fleet mines by 38.6% and flips the four-year cash result from a loss to a profit. The halving arrives 42% of the way in.

Cumulative bitcoin mined by fifty Antminer S21 Pro units over four years

Two runs of the same model on the same difficulty path. The upper line freezes the block reward at 3.125 BTC forever. The lower line steps it down at day 559. The two are the same line until the halving, which is why a frozen-subsidy calculator looks accurate right up to the moment it stops being accurate.

Overstatement +38.6%
0.01.02.03.04.05.06.07.0 day 0day 365day 730day 1,095day 1,460 block 1,050,000, day 559 7.35 5.31 reward frozen at 3.125 BTC reward stepped to 1.5625 BTC BTC

Running the default fleet forward 1,460 days with the subsidy stepped down at day 559 produces 5.307 BTC and $334,613 of gross revenue. Running the same fleet on the same difficulty path with the reward frozen at 3.125 BTC produces 7.354 BTC and $463,687. The difference is 38.6%, or $129,074 of revenue that the second run invents. Both runs use identical hardware, identical uptime, identical power price and identical difficulty drift of 0.2% per retarget. The subsidy schedule is the only input that differs.

The overstatement is not evenly spread and that is what makes it dangerous. For the first 559 days the two runs are the same number to the last decimal, because before the halving there is nothing to disagree about. All of the error lands in the final 853 days, which is the stretch a buyer is relying on to finish paying for the machines.

The cash result changes sign rather than degree. With the halving applied, four years of this fleet at $85,941 and $0.05 per kWh nets −$6,956.60 against $338,224 of electricity, which is a loss before the $96,900 of hardware is considered at all. With the reward frozen, the same four years net $120,826.38 and the fleet looks like a business. A swing of $127,783 on a $96,900 purchase is not a modelling nuance; it is the difference between a payback table and a write-off, and it is produced by one line of the model.

Four years, 1,460 days from 2 Oct 2026 Subsidy stepped at day 559 Reward frozen at 3.125 BTC Overstatement
Bitcoin mined5.307 7.354+38.6%
Gross revenue$334,613 $463,687$129,074
Pool fees$3,346 $4,637$1,291
Electricity$338,224 $338,224identical
Net, before hardware −$6,957 $120,826 $127,783
Net, after $96,900 of hardware −$103,857 $23,926 $127,783

Both columns integrate in 5-day steps at a flat bitcoin price of $85,941, so nothing here is a price forecast. The frozen column is produced by asking the engine for the difficulty of day t and the subsidy of day zero, which is exactly what a calculator with a fixed reward field does.

06

Day 559 is inside the warranty

The halving arrives 1.66 years after the reading, which is 55% of the way through a three-year straight-line book life and 42% of the way through this model's 4.0-year hardware assumption.

Day 559 is 1.66 years from the 2 October 2026 reading. A miner bought new today and written off straight line over three years still carries $43,245 of book value out of $96,900 on the day the subsidy halves, meaning 45% of the purchase is still waiting to be earned back when the revenue side is cut in half. This site's network production-cost model assumes a 4.0-year hardware life, on which the halving lands 42% of the way through.

Resale does not rescue the position, because every other owner faces the same block height on the same day. The three-method residual model on this site puts the default fleet's realisable value at $30,511 on day 559, against $96,900 paid, after the 15% liquidation haircut. That estimate is a model output rather than an observed price, and it already assumes a buyer exists. The honest version of the sentence is that the machines are worth what a buyer can earn with them, and on day 559 every buyer is looking at the same halved subsidy.

The practical consequence is a question about ordering rather than about forecasting. A machine bought in August 2026 gets roughly 559 days at the current subsidy and then several years at half of it, so the purchase has to be justified by the second regime and not the first. Any payback figure quoted in months that does not name a halving date is describing the first 559 days and quietly assuming the rest.

559 days to the halving from the 2 October 2026 reading, which is 1.66 years
3-year book straight line leaves $43,245 of the $96,900 unrecovered at the halving
4-year model the halving lands 42% of the way through the assumed hardware life
Residual modelled realisable value on day 559 is $30,511, a model output, not a quote
Second halving block 1,260,000, roughly day 2,065, still inside a ten-year plan

Production cost cross-checks: Checkonchain difficulty regression · JPMorgan, 2026-06 · Residual and book value are outputs of src/engine.js

07

Questions people actually ask

When is the next Bitcoin halving?

The next Bitcoin halving happens at block height 1,050,000, not on a calendar date. As of the network reading taken on 2 October 2026 at height 969,538, 80,462 blocks remain. At a perfect ten-minute block that is 559 days, which projects to 12 April 2028. The projection is arithmetic, not a schedule: blocks have been arriving slightly faster or slower than ten minutes for the whole history of the network, and every tenth of a minute of average interval moves the projected date by about 6 days.

What does the halving do to Bitcoin mining profitability?

The halving cuts the block subsidy from 3.125 BTC to 1.5625 BTC and leaves the electricity bill exactly where it was, so the bitcoin price at which a machine stops covering its own power doubles. For the default fleet on this site, fifty Antminer S21 Pro units at $0.05 per kWh, the shutdown price moves from $41,949 to $83,898. At the 2 October 2026 spot price of $85,941 that fleet earns $116.53 a day today and would lose $57.57 a day on the same difficulty after the halving.

How many mining machines stop being profitable at the halving?

Of the 27 machines in this catalogue, 17 cover their own electricity at the 2 October 2026 spot price of $85,941, at $0.05 per kWh with PUE 1.10. After the halving, holding both the price and the difficulty still, 3 do: Antminer S23 Hyd, SealMiner A4 Pro Air, Antminer S23. That is 14 machines that pay for their power today and would not pay for it the day after block 1,050,000. All 3 survivors are 2026 hardware under 11.0 J/TH.

How much does ignoring the halving overstate a four-year mining projection?

By 38.6% of the bitcoin mined, on this model, over 1,460 days from 2 October 2026. Stepping the subsidy down at day 559 yields 5.307 BTC and $334,613 of gross revenue for the default fleet. Freezing the reward at 3.125 BTC on the same difficulty path yields 7.354 BTC and $463,687, an overstatement of $129,074. The sign of the answer changes, not just its size: with the halving applied the four-year cumulative net is −$6,956.60, and with the reward frozen it is $120,826.38.

Does the halving cut transaction fee income as well?

No, but on this model fee income is too small to matter either way. Fees are carried here as a percentage of the subsidy, currently 0.71%, drawn from the 0.0223 BTC 30-day average fee per block. Cointelegraph reported on 12 August 2026 that fees had fallen to 0.69% of miner revenue, a ten-year low. Because fees are modelled as a share of the subsidy, the fee term halves with it, and the total reward per block therefore halves exactly. If fees instead held their absolute level, the post-halving reward would be a fraction of a percent higher than half. That correction is smaller than the rounding on the difficulty estimate.

Reset monitor · this device

Before the next trade

After a loss, a big win or a long session, take a few minutes off the desk before the next trade.

Why the break?

On the desk today: . Counts while a desk page is open and on screen.

Foreword

Exclusive TunaLead writer · pen name

Trading 15-minute markets moves fast. A setup can change in minutes, so I want the right information in front of me before I make a decision.

That’s why I use PM Countdown. It puts the indicators and market information I care about in one place, so I can review the setup, understand the price being offered, and decide whether it’s actually worth taking.

The reset is part of my process too. After a big win, a tough loss, or too much time at the screen, five minutes away helps me come back focused instead of chasing the next trade.

I don’t need to trade every market. I want the right setup at the right price. PM Countdown helps me stay disciplined and wait for it.

Exclusive Tuna

Reset running

5:00

Answer honestly. Only you see this, and nothing is saved.

  1. Is the next trade about getting that loss back?
  2. Do I know today’s loss limit in dollars?
  3. Have I reached it?
  4. Would I size the next trade bigger than I planned this morning?
  1. Have I moved some of it to my bank account?
  2. Does money I just won feel easier to risk than money I put in?
  3. Would I size up the next trade because I’m up?
  4. Do I know when I’m stopping today?
  1. Have I stood up in the last hour?
  2. Have I eaten something in the last few hours?
  3. Did I get a normal night’s sleep?
  4. Is it later than I planned to stop?

After a loss

Let this one go.

After a big win

Move some of it to your bank.

What to do with a big win: the set-aside, the move off the exchange, and the size of the next bankroll.

Been at it too long

Get up for a bit.

Tools for a longer break
Your limits

The most you’re OK losing today. We’ll keep it in front of you.

Saved only in this browser. Nothing is sent to us. Gambling problem? Call or text 1-800-MY-RESET.

Halving height1,050,000
Blocks remaining80,462
Days at 10 min558.8
Shutdown now$41,949
Shutdown after$83,898
Machines alive now17 of 27
After the halving3 of 27
4yr overstatement+38.6%